First Quarter 2017 SPECpower_ssj 2008 Results
These results have been submitted to SPEC; see the disclaimer before studying any results.
Hardware Vendor Test Sponsor |
System Enclosure (if applicable) |
Nodes | JVM Vendor | Processor | Total Memory (GB) |
Submeasurements | Result (Overall ssj_ops/watt) |
||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CPU Description | MHz | Chips | Cores | Total Threads |
ssj_ops @ 100% |
avg. watts @ 100% |
avg. watts @ active idle |
||||||
Huawei Technologies Co., Ltd | FusionServer XH321 V3
Huawei FusionServer X6000 Mar 29, 2017 | HTML | Text |
4 | Oracle Corporation | Intel Xeon E5-2699 v4 | 2200 | 8 | 176 | 352 | 256 | 15,118,177 | 1,322 | 232 | 10,261 |
Search/Filter/Sort SPECpower_ssj 2008 Results
The Results Search tool supports dynamic views of all published SPEC results.
Each of these searches also supports an optional “Advanced” or “Forms” interface that provides fine-grain control of all search parameters and supports multi-level sorts of the outputs, e.g. the Advanced SPECpower_ssj 2008 results search interface.